This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Search results for Construction methods
Bridge and deck construction
We are a multidisciplinary partner providing turnkey solutions for structural equipment and erection of bridge decks, and increasingly, for the installation of the entire structure, including piers, deck and finishing works.
Ihsaniye viaduct incremental launching
Important savings in raw material and optimized execution planning were some of the many advantages of the alternative solution proposed by Freyssinet to build the Ihsaniye viaduct.
TMCLK Link in Hong-Kong: balanced cantilever erection
As part of the design-build project for a set of precast segmental bridges, choice of the erection method was key to its achievement. Opting for the balanced cantilever erection with launching gantry made the difference.
Yuen Long Station LTR footbridge erection
The project involves the construction of two 50m-long bridges above the light rail tracks, in non-traffic hours only, making the use of conventional erection method impossible.
Çayırköy viaduct incremental launching
While incremental launching was the most appropriate method to construct the viaduct, it required complete rethinking to adapt to the project’s unusual configuration.
Adelaïde Superway erected with a launching gantry
Connecting north and south Adelaïde, the South Road Superway includes a 2.8-km elevated roadway. Freyssinet proposed the balanced cantilever erection with launching gantry as the most beneficial construction method.
Bridges
The West Gate Tunnel project in Melbourne is much more than a tunnel.
Under an Alliance Agreement with the CPB John Holland joint venture, Freyssinet takes part to the construction of the elevated road above Footscray road that will connect the WestGate tunnel and a bridge over the Maribyrnong river. We bring to the project our experience in bridge technology and advanced construction methods.