Build
France
Paris La Défense Arena roof lifting operation
1,700-tons roof lifting operation for one of the largest multi-use domed stadiums in Europe
Build
Hong Kong
TMCLK Link in Hong-Kong: balanced cantilever erection
As part of the design-build project for a set of precast segmental bridges, choice of the erection method was key to its achievement. Opting for the balanced cantilever erection with launching gantry made the difference.
Build
Turkey
Ihsaniye viaduct incremental launching
Important savings in raw material and optimized execution planning were some of the many advantages of the alternative solution proposed by Freyssinet to build the Ihsaniye viaduct.
Repair
UK
Hammersmith innovative post-tensioning system
Conventional solutions for strengthening a critical viaduct in west London proved impractical and led to the development of a ‘plug and play’ post-tensioning system and bespoke erection equipment.
Repair
United Kingdom
St George’s Bridge expansion joint replacement
After more than 10 years of service, an assessment by Doncaster Council indicated that carriageway refurbishment and essential safety repairs were required for expansion joint replacement.
Repair
Australia
Melbourne Webb Dock Restoration
As part of a major port development project in Melbourne, Freyssinet has been awarded the dock restoration of the Webb Dock port facility.
Repair
FRANCE
Saint-Cloud Viaduct – Cathodic protection
To prevent corrosion on a 1,100-metre long structure, Freyssinet's teams installed a large-scale Impressed Current Cathodic Protection system (ICCP).
Repair
Madagascar
Sahasinaka masonry structure strengthening
Featuring a combined concrete and masonry structure, the Sahasinaka viaduct was built in 1934. As one of the pier foundations showed signs of subsidence, structural strengthening of the bridge was conducted by Freyssinet.
Repair
France
La Ricamarie bridge – Additional prestressing
Extending the lifespan of the viaduct by 100 years is what Freyssinet achieved after proposing a turnkey service to conduct heavy retrofitting works including additional prestressing, and completing them ahead of schedule.