New cable-stayed bridge in Bangkok: installation of cables to start soon!
Freyssinet Thailand, together with Freyssinet Major Projects Department, design, supply and install the stay cable system -cables, anchorages, dampers- and will carry out the waterproofing and fatigue tests.
Our client also entrusted us with the supply and installation of monitoring equipment that will track the structural health of the bridge to optimise its future maintenance.
- Owner: Expressway Authority of Thailand
- Design & engineering: Epsilon Design Consultancy
- Main Contractor and Client: CH. Karnchang Public Company Limited
- Expected duration of Freyssinet work: 13 months