Share this page

Our case studies

Scroll down
Scroll down
Filter by:
BUILD
United Kingdom

Library of Birmingham, PT slabs rather than steel frame

Construction of the library of Birmingham was originally conceived as a structural steel frame. During the tender period, and in order to realise the full value engineering benefits, the frame was changed to reinforced concrete with post-tensioned slabs and beams
REPAIR
Indonesia

Improved hydraulic efficiency at Larona

A tensioning system to increase the water flow and speed up installation, and upstream preparation on a 1:1 scale replica of the canal: these were the keys to the successful waterproofing of the Larona hydroelectric plant.
Build
France

Allonne bridge construction by rotation

Installation of a cable-stayed bridge by rotation over a heavily trafficked motorway whose configuration does not allow for a traditional incremental launching construction method.
Build
Canada

Vendôme station tunnel installed by Autoripage

Creation of a pedestrian tunnel under the railway tracks of the Vendôme metro station in Montreal by Autoripage.
Build
France

CNIT underground station jacking

The construction of a station located underneath a Paris shopping centre required the taking up of a load of a frame assembly of some 100,000 tonnes, thanks to an innovative jacking system.
Build
France

Nîmes reservoir prestressing system

Use of prestressing to ensure sustainable waterproofing and optimise the sizing of a tall tank digester.
Build
Canada

Hebron Oil Field – Offshore prestressed platform

Reinforcement of the ExxonMobil offshore platform in Canada with 2,400 tonnes of post-tensioning to ensure waterproofing and iceberg-resistance of its concrete structure.
Build
France

Millau viaduct construction

The unique launching procedure that was employed to build the deck of France’s prestigious Millau Viaduct put construction and cable-stay technology to the test.
Build
France

Verdun-sur-Garonne suspension bridge

In South West France, where environmental conditions can create maintenance headaches, durability was a high priority for the authority commissioning a new suspension bridge.
Freyssinet Corporate
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

More information about our Privacy Policy

More information about our Cookie Policy