Repair
UK
Eastbourne carpark structural strengthening
A novel precast shell system made of ultra high-performance fibre-reinforced concrete enabled extra floors to be swiftly added to a multi-storey car park without its operation being disrupted.
Repair
Spain
CACI factory structural strengthening
Refurbishment and structural strengthening of a reinforced concrete factory built in 1899 using the system pioneered by French engineer François Hennebique with the aim of adapting the plant to fulfil the client's new requirements.
Repair
France
Condat Group warehouse concrete repairs
In Chasse sur Rhône, south of Lyon, we have been contracted for vaults concrete repairs works for the CONDAT Lubricants factory. These works follow those carried out in 2009 following an explosion on the site. Over the last 10 years, the client has called on our teams five times.
Build
Turkey
Sultan Yavuz Selim, the hybrid bridge
The third Bosphorus crossing pushed stay cable technology to the next level, combining a traditional suspension system with high-strength cables to stabilise the bridge and future-proof it for trains.
Repair
UK
Cromarty bridge renovation
Tidal conditions and traffic management were the key constraints that had to be addressed by the team responsible for carrying out repairs to this critical network connection.
Repair
Worldwide
CRH asset management partnership
An asset management system that can be used to remotely assess concrete silos and prioritise repairs was developed as part of a long-term partnership with materials manufacturer CRH.
Repair
Chile
Colorado bridge beam replacement
One of the main beams of a bridge that crosses a key motorway in Chile had to be urgently replaced after it was irreparably damaged by an overheight vehicle.
Repair
Jordan
Clemenceau Medical Center rehabilitation
Building rehabilitation project to turn a high-rise hotel building into a hospital facility, that needed extensive strengthening works to accommodate the revised loads.
Repair
UK
Channel Tunnel concrete repairs
Mobilisation on a momentous scale paved the way to an early finish on the extensive concrete repairs needed to put the Channel Tunnel back into operation after a devastating fire.