Jukseong Jeongok is a cable-stayed bridge
located in the Northern Region of South Korea near the border with North
Korea. The 400-meter-long structure is made of a main span mixed deck (steel
girders segments and precast slab elements), back stay cables anchored
in side concrete bulkheads, 2 “A” shaped concrete pylons and 2 planes
of stay cables with H2000 anchorages.
On this project the Freyssinet teams were in charge of the production and
installation of the precast slabs on the main span deck and also of the
supply and installation of H2000 stay cable system: